Kitchen Remodels in San Francisco: Local Permits and Housing Facts
Kitchen remodels in San Francisco
San Francisco issued 2,040 kitchen remodel permits over the last 12 months, and 63% of those were on one- and two-family homes.

San Francisco at a glance
- Kitchen remodel permits issued, all property types, City and County of San Francisco, last 12 months
- 2,040 permits
- Share of kitchen remodel permits on one- and two-family homes, City and County of San Francisco, last 12 months
- 63%
- Median estimated construction cost on one- and two-family home kitchen remodel permits, City and County of San Francisco, last 12 months
- $60,000
San Francisco Department of Building Inspection, Building Permits (DataSF) · data as of
- Numbers from SF DBI and US Census public records
- Up to three local contractors, never a long list
- Free, no obligation
San Francisco permit figures and housing facts
San Francisco permit figures and housing facts
Local numbers for San Francisco, each with its source and date.
- Median days from filing to issue, one- and two-family home kitchen remodel permits, City and County of San Francisco, last 12 months1
- 2 days
- Share of housing units built before 1980, City and County of San Francisco2
- 76.5%
- Median year structure built, all housing units, City and County of San Francisco2
- 1946
- Share of occupied housing units that are owner-occupied, City and County of San Francisco2
- 38.2%
- Median value of owner-occupied homes, City and County of San Francisco2
- $1,394,500
Planning your project
What San Francisco's homes mean for your kitchen remodel
In San Francisco, 2,040 kitchen remodel permits were issued over the last 12 months across all property types. For one- and two-family homes, the median estimated construction cost on those permits was $60,000.
Most homes here are older. The Census puts 76.5% of San Francisco housing units built before 1980 (2020–2024), with a median year built of 1946. Plan for checks on the electrical panel, old wiring and supply pipes, and the drains and venting before you open walls.
Most occupied homes in San Francisco are rented. The Census shows 38.2% of occupied units are owner-occupied (2020–2024). If you own a rental, plan the schedule around your tenants and talk through how the work fits your plans.
The median value of owner-occupied homes is $1,394,500 (Census 2020–2024). Use that only to frame budget against resale in general terms. Get an estimate for your home to set your own budget.
Estimated construction cost on San Francisco kitchen remodel permits
| Project | Figure | Range on a shared scale |
|---|---|---|
| Median estimated construction cost, kitchen remodel permits on one- and two-family homesEstimated cost on the permit application, not a contract price. City and County of San Francisco, last 12 months. | $60,000 |
Bars share one scale, from $0 to $60,000.
This is the median estimated construction cost written on San Francisco permit applications for kitchen remodels on one- and two-family homes over the last 12 months. It is what the applicant expected the permitted work to cost, not a contract price or a quote. Your real project cost is often higher because of design, finishes, work not on the permit and your home's condition. Get an estimate for your home to learn your number.
The typical path for a San Francisco kitchen remodel
The typical path for a San Francisco kitchen remodel
Plan the layout and budget
Decide what you want from the room, such as a new layout, more storage or better light. Set a budget range that includes design, finishes and a margin for surprises in an older home.
Design and choose materials
Choose cabinets, counters, flooring, lighting and appliances. Confirm the sizes and power needs of new appliances early.
Check whether you need a permit
Ask your contractor and confirm with the San Francisco Department of Building Inspection whether your work needs a building permit. Rules depend on the scope of the work.
Apply for the permit where needed
If a permit is needed, your contractor or designer usually prepares the application. The application lists the estimated cost of the work.
Demolition and testing first
In older homes, test for lead-based paint in homes built before 1978 and for possible asbestos in old flooring or ceiling texture before demolition. Plan for these checks rather than assuming they are not needed.
Rough-in plumbing and electrical
Plumbing and electrical rough-in is done, with inspections where the permit requires them. In older homes, this is when the electrical panel, circuit capacity, galvanized supply pipes, cast-iron drains and venting are checked and updated.
Cabinets, counters and fixtures
Install cabinets, counters, backsplash, sink, faucet and fixtures once the rough-in work passes. Plan the order with your builder so each trade has room to work.
Final inspection and handover
Schedule the final inspection where the permit requires it, then review the finished work with your builder before final payment.
Kitchen remodel questions for San Francisco homeowners
Do I need a permit for a kitchen remodel in San Francisco?
Often yes, but the rules depend on the work. Ask your contractor and confirm with the San Francisco Department of Building Inspection before demolition starts. In San Francisco, 2,040 kitchen remodel permits were issued over the last 12 months, covering all property types.
Why do older San Francisco homes need extra checks?
Many homes here are old. In San Francisco, 76.5% of housing units were built before 1980 (Census 2020–2024), and the median year built is 1946. Older homes often need checks on the electrical panel and circuits, galvanized supply pipes, cast-iron drains, venting, and lead-based paint testing before demolition in homes built before 1978. Possible asbestos in old flooring or ceiling texture is also worth checking. These are things to check, not certainties for every house.
What does the $60,000 cost figure mean?
The $60,000 figure is the median estimated construction cost on kitchen remodel permits for one- and two-family homes in San Francisco over the last 12 months. It is the estimate written on the permit application, not a contract price. Your real cost depends on your plans, finishes and your home's condition, so get an estimate for your home.
How long do kitchen remodel permits take in San Francisco?
The median time from filing to issue was 2 days for one- and two-family home kitchen remodel permits in San Francisco over the last 12 months. Your own timing depends on your project and the city's review, so confirm the process with your builder.
How do I start planning my kitchen remodel?
Check any contractor's license status with the CSLB (Contractors State License Board). Then request a free, no-obligation estimate. The request goes to one local builder, who can review your plans and explain the next steps.
Recent work by a contractor in our network
Photos from the contractor's own projects, used with permission. Captions name the type of work.

Kitchen, whole-home remodel 
Kitchen remodel 
Kitchen remodel 
Kitchen remodel 
Whole-home remodel 
Kitchen, major remodel
Request a free estimate from a local builder for your kitchen remodel
Tell us about the project. It takes about 30 seconds.
- You send a short request. Project type, ZIP code, timing and how to reach you.
- We match it. A local contractor for your project gets your request. Up to three may contact you, and we email you each one's name.
- You talk about your project. The estimate is free, with no obligation to hire.
Thanks — your request is in.
We're matching your project now. When a contractor takes it, we email you their name and phone number so you know who is calling.
We're matching your project now. A local contractor will call you at the number you gave us to talk about the next step.
Who gets your request
Your local match
Your project · works in San Francisco
Matched to your project. We check the project type and ZIP first. Up to three local contractors may contact you, and we email you each one's name.