ADUs in Glendale

Glendale issued 371 ADU permits in 2025, as reported so far; the city ranked 3 of 79 in Los Angeles County.

Concept of a detached backyard ADU with white stucco, cedar siding and a small garden patio
Home inspiration · Concept image

What are you planning?

Project type

Free, no obligation. Up to three local contractors, never a long list.

Glendale at a glance

ADU units with building permits issued in 2025 in the City of Glendale, as reported so far
371
ADU units completed (certificate of occupancy) in 2025 in the City of Glendale, as reported so far
290
Rank by ADU units permitted in 2025 among 79 reporting Los Angeles County cities, City of Glendale
3 of 79

California HCD, Housing Element Annual Progress Report (APR), Table A2 · data as of

  • Numbers from HCD public records
  • Up to three local contractors, never a long list
  • Free, no obligation

A useful first step

Before you start in Glendale

Start with Planning and Glendale Water & Power.

What to prepare

Glendale’s ADU checklist asks you to clear the concept with Planning/Zoning and utilities before preparing the drawings. Gather site and floor plans, elevations and a photo survey; confirm the checklist for your specific project.

Glendale permit guidance · Checked

What do permits say an ADU costs?

From City of LA building permits, last 12 months. Not a contract price. How we calculate this

Declared values on City of Los Angeles building permits, last 12 months. The dataset covers the City of Los Angeles only, so treat it as a regional reference for Glendale. A declared value is what the permit states, not your contract price. How we calculate this.

Project type

$140,544median declared value, new ADU

Middle half of 2,004 permits Median

Every lot is different. A local contractor can price your project.

Source: LA Department of Building and Safety, Building Permits Issued 2020 to Present (data.lacity.org), permits on one- and two-family homes issued to ; fire rebuilds excluded. ZIP medians need 20+ permits.

Official ADU numbers for the City of Glendale

Official ADU numbers for the City of Glendale

Local numbers for Glendale, each with its source and date.

Change in ADU units permitted in the City of Glendale, 2022 to 20251
-12.3%
  1. 1 California HCD, Housing Element Annual Progress Report (APR), Table A2 · data as of
ADU units permitted in Glendale, by yearEach bar is one year of building permits, as the city reported them to the state.
ADU units permitted in Glendale, by year
YearCount
2018117
2019135
2020149
2021296
2022423
2023269
2024250
2025371

3rd of 79 LA County cities for ADU permits in 2025

* 2025 counts can still rise as late reports come in. Source: California HCD, Housing Element Annual Progress Report (APR), Table A2, data as of .

Planning your project

Glendale homeowners are building ADUs at a steady pace. The state's housing report shows 371 ADU units with building permits issued in 2025, as reported so far, and 290 units completed in the same year. That places Glendale 3 of 79 reporting Los Angeles County cities.

Many owners build an ADU for rental income or to house family close by. Common types include a detached backyard unit, an attached unit added to the main house, and a garage conversion. Each type depends on your lot, setbacks and parking, so a site review is the right starting point.

The permit count fell 12.3% from 2022 to 2025, so the local trend is worth watching. Use these figures as a starting point, then ask a local builder how current city rules apply to your property.

How an ADU gets built in Glendale

How an ADU gets built in Glendale

  1. Check feasibility for your lot

    Confirm what your lot allows, including the ADU type, size limits, parking and utility access. Write down your goals, such as rental income or family housing.

  2. Prepare design and plans

    Create a site plan and floor plans. A local builder can prepare drawings that show the unit, setbacks and any garage changes.

  3. Submit for plan check and permit

    Submit the plans to the City of Glendale for plan check. The city's review may ask for changes before a permit is issued.

  4. Build with inspections

    Build the unit under the issued permit. Inspections happen at key stages, such as foundation, framing, electrical and plumbing.

  5. Final sign-off and move-in

    Once the final inspections pass, the city signs off the project. Then the unit can be occupied, rented or used for family.

Questions Glendale homeowners ask about ADUs

Do I need a permit to build an ADU in Glendale?

In most cases yes. Glendale runs its own permit process, so plan on a building permit for a new backyard ADU. Whether a garage conversion needs extra review depends on the lot and the city's review, so ask the builder to confirm the path for your property.

Can I convert my garage into an ADU in Glendale?

Often it can be, but it depends on the garage, its size, setbacks, parking and utilities. The city's review decides what is allowed on your lot. A local builder can check the current requirements before you commit to a design.

Can I rent out an ADU in Glendale?

Many homeowners rent their ADU, but local rules, your loan terms and HOA rules can limit how you use it. Confirm the rules for your property with the city and your lender before you plan around rental income.

How do I start an ADU project in Glendale?

Start by confirming what your lot allows and listing your goals, such as family housing or rental income. Then request a free estimate from a local builder, who can walk through the design, plan check and permit steps with you.

How many ADU permits does Glendale issue?

The state's annual housing report lists 371 ADU units with building permits issued in Glendale in 2025, as reported so far. Late reports can still raise that count, so check the latest figures before drawing conclusions.

How can I check a contractor's license in California?

You can check any contractor's license status with the CSLB (Contractors State License Board) before you sign anything. Ask the builder for their license number and confirm it on the CSLB site.

Compare ADU activity across LA County

Where LA County is building ADUs

ADU units permitted in 2025, city by city. Select a city to open its guide.

Map of LA County cities shaded by ADU units permitted in 2025, with Glendale outlinedAgoura Hills: 17 ADU units permitted in 2025Alhambra: 102 ADU units permitted in 2025Arcadia: 98 ADU units permitted in 2025Artesia: 39 ADU units permitted in 2025Azusa: no HCD reportBaldwin Park: 119 ADU units permitted in 2025Bell: 25 ADU units permitted in 2025Bell Gardens: 26 ADU units permitted in 2025Bellflower: 18 ADU units permitted in 2025Beverly Hills: 31 ADU units permitted in 2025Bradbury: no HCD reportBurbank: 241 ADU units permitted in 2025Calabasas: 15 ADU units permitted in 2025Carson: 41 ADU units permitted in 2025Cerritos: 12 ADU units permitted in 2025Claremont: 23 ADU units permitted in 2025Commerce: no HCD reportCompton: no HCD reportCovina: 34 ADU units permitted in 2025Cudahy: 24 ADU units permitted in 2025Culver City: 83 ADU units permitted in 2025Diamond Bar: 50 ADU units permitted in 2025Downey: 146 ADU units permitted in 2025Duarte: 23 ADU units permitted in 2025El Monte: 107 ADU units permitted in 2025El Segundo: 25 ADU units permitted in 2025Gardena: 52 ADU units permitted in 2025Glendale: 371 ADU units permitted in 2025Glendora: 57 ADU units permitted in 2025Hawaiian Gardens: 11 ADU units permitted in 2025Hawthorne: 76 ADU units permitted in 2025Hermosa Beach: 11 ADU units permitted in 2025Hidden Hills: no HCD reportHuntington Park: 45 ADU units permitted in 2025Industry: no HCD reportInglewood: 147 ADU units permitted in 2025Irwindale: no HCD reportLa Canada Flintridge: 30 ADU units permitted in 2025La Habra Heights: no HCD reportLa Mirada: 23 ADU units permitted in 2025La Puente: 28 ADU units permitted in 2025La Verne: 22 ADU units permitted in 2025Lakewood: 99 ADU units permitted in 2025Lancaster: 209 ADU units permitted in 2025Lawndale: no HCD reportLomita: 7 ADU units permitted in 2025Long Beach: 644 ADU units permitted in 2025Los Angeles: 7,446 ADU units permitted in 2025Lynwood: no HCD reportMalibu: 5 ADU units permitted in 2025Manhattan Beach: 24 ADU units permitted in 2025Maywood: no HCD reportMonrovia: 58 ADU units permitted in 2025Montebello: 61 ADU units permitted in 2025Monterey Park: 78 ADU units permitted in 2025Norwalk: 119 ADU units permitted in 2025Palmdale: 68 ADU units permitted in 2025Palos Verdes Estates: 20 ADU units permitted in 2025Paramount: 57 ADU units permitted in 2025Pasadena: 222 ADU units permitted in 2025Pico Rivera: 96 ADU units permitted in 2025Pomona: no HCD reportRancho Palos Verdes: 16 ADU units permitted in 2025Redondo Beach: 25 ADU units permitted in 2025Rolling Hills: no HCD reportRolling Hills Estates: 5 ADU units permitted in 2025Rosemead: 136 ADU units permitted in 2025San Dimas: 30 ADU units permitted in 2025San Fernando: 40 ADU units permitted in 2025San Gabriel: 54 ADU units permitted in 2025San Marino: 14 ADU units permitted in 2025Santa Clarita: 29 ADU units permitted in 2025Santa Fe Springs: 15 ADU units permitted in 2025Santa Monica: 143 ADU units permitted in 2025Sierra Madre: 26 ADU units permitted in 2025Signal Hill: 8 ADU units permitted in 2025South El Monte: 22 ADU units permitted in 2025South Gate: 154 ADU units permitted in 2025South Pasadena: 26 ADU units permitted in 2025Temple City: 69 ADU units permitted in 2025Torrance: 89 ADU units permitted in 2025Vernon: no HCD reportWalnut: 36 ADU units permitted in 2025West Covina: no HCD reportWest Hollywood: 36 ADU units permitted in 2025Westlake Village: no HCD reportWhittier: 86 ADU units permitted in 2025
ADU units permitted, 2025
  • 0–21
  • 22–28
  • 29–56
  • 57–99
  • 100+
  • No report
  • Unincorporated

Most ADU permits in 2025

  1. 1Los Angeles7,446
  2. 2Long Beach644
  3. 3Glendale371
  4. 4Burbank241
  5. 5Pasadena222
  6. 6Lancaster209
  7. 7South Gate154
  8. 8Inglewood147
  9. 9Downey146
  10. 10Santa Monica143

Planning an ADU? A local builder can price yours.

Get my free estimate

Permits: California HCD, Housing Element Annual Progress Report (APR), Table A2, data as of ; 2025 counts can still rise. Boundaries: Los Angeles County, City and Unincorporated Boundaries (Legal) (mainland only (islands omitted). simplified to about 300 m.)

Request a free estimate from a local builder for your ADU project

Tell us about the project. It takes about 30 seconds.

  1. You send a short request. Project type, ZIP code, timing and how to reach you.
  2. We match it. A local contractor for your project gets your request. Up to three may contact you, and we email you each one's name.
  3. You talk about your project. The estimate is free, with no obligation to hire.
What do you need?

* Add your email and we'll send you your contractor's name and phone number, so you know who's calling, plus updates as your project moves forward. We only use it for this request.

We match your request to a local contractor. Up to three in our network may contact you, and we email you each one's name. Read the consent above before sending.

Who gets your request

Your local match

Your project · works in Los Angeles County

Matched to your project. We check the project type and ZIP first. Up to three local contractors may contact you, and we email you each one's name.

  • Dark-tiled bathroom with a floating vanity and frameless glass
  • Living area in a new unit with a sofa and dining table
  • Living room of a new unit with neutral furniture

Works in Glendale

  • Glendale
  • Los Angeles
  • Bel Air
  • Brentwood
  • +36 more

Service areas as listed by the contractor ()

Get my free estimate