Building an ADU in Palmdale, CA
Building an ADU in Palmdale
68 ADU units had building permits issued in 2025 so far, as reported to the state; 19.5% of Palmdale housing units were built before 1980 (2020 to 2024).

Palmdale at a glance
- ADU units with building permits issued in 2025 so far, Palmdale
- 68
- ADU units completed (certificate of occupancy) in 2025 so far, Palmdale
- 46
- Rank by ADU units permitted in 2025 among 79 reporting Los Angeles County cities, Palmdale
- 25 of 79
California HCD, Housing Element Annual Progress Report (APR), Table A2 · data as of
- Numbers from HCD and US Census public records
- Up to three local contractors, never a long list
- Free, no obligation
What do permits say an ADU costs?
From City of LA building permits, last 12 months. Not a contract price. How we calculate this
Declared values on City of Los Angeles building permits, last 12 months. The dataset covers the City of Los Angeles only, so treat it as a regional reference for Palmdale. A declared value is what the permit states, not your contract price. How we calculate this.
Source: LA Department of Building and Safety, Building Permits Issued 2020 to Present (data.lacity.org), permits on one- and two-family homes issued to ; fire rebuilds excluded. ZIP medians need 20+ permits.
Palmdale ADU permits and local housing facts
Palmdale ADU permits and local housing facts
Local numbers for Palmdale, each with its source and date.
- Change in ADU units permitted, 2022 to 2025, Palmdale1
- -8.1%
- Share of Palmdale housing units built before 1980 (2020 to 2024)2
- 19.5%
- Median year structure built, Palmdale (2020 to 2024)2
- 1989
- Share of occupied Palmdale housing units that are owner-occupied (2020 to 2024)2
- 66.2%
- Median value of owner-occupied homes, Palmdale (2020 to 2024)2
- $471,000
| Year | Count |
|---|---|
| 2021 | 20 |
| 2022 | 74 |
| 2023 | 66 |
| 2024 | 58 |
| 2025 | 68 |
25th of 79 LA County cities for ADU permits in 2025
* 2025 counts can still rise as late reports come in. Source: California HCD, Housing Element Annual Progress Report (APR), Table A2, data as of .
Planning your project
What Palmdale's homes mean for your ADU
In Palmdale, 68 ADU units had building permits issued in 2025 so far, and 19.5% of housing units were built before 1980 (2020 to 2024 Census estimates). For most lots, the main planning questions are space, setbacks and utility connections, not old systems.
Most Palmdale homes are newer, with a median year built of 1989. Start by confirming what your lot allows with the city, then measure the space for the unit and mark where water, sewer, gas and electric lines can connect.
Owner-occupied homes make up 66.2% of occupied units in Palmdale, so most ADU projects serve people improving the home they live in. The median value of owner-occupied homes is $471,000. Use that figure to frame your budget in general terms: spend in proportion to what the home is worth, and plan for the work your lot needs.
If you plan to rent the ADU, note that the change in ADU units permitted from 2022 to 2025 is -8.1%, so check current local conditions before you commit.
The typical path for an ADU in Palmdale
The typical path for an ADU in Palmdale
Check what your lot allows
Confirm what your lot allows with the city before you spend on design. Ask about setbacks, lot coverage, parking and utility connections for your address.
Design and plans
Work with your builder to create a layout, site plan and construction drawings that show the unit, its entrance and where utilities connect.
Plan check and permit
Submit your plans to the city for plan check. Expect comments to fix before the city issues a permit. If your home is older, include notes on existing wiring, plumbing and framing.
Construction and inspections
Build the unit with inspections at key stages, such as foundation, framing, rough electrical and plumbing, and insulation. Keep your permit and inspection records together.
Final sign-off
After the last inspection, the city signs off on the project. Keep the final documents for your records and for any future sale or refinance.
Questions about ADUs in Palmdale
How many ADU permits did Palmdale issue in 2025?
68 ADU units had building permits issued in 2025 as reported so far, and 46 ADU units were completed in 2025 as reported so far. Palmdale ranks 25 of 79 reporting Los Angeles County cities for ADU units permitted in 2025. These counts may still rise as late reports arrive.
Does the age of Palmdale homes affect my ADU project?
19.5% of Palmdale housing units were built before 1980, and the median year built is 1989 (2020 to 2024 Census estimates). Most lots are newer, so space, setbacks and utility connections usually matter more. If your home is in the older part of the stock, ask your builder to check its wiring, plumbing and framing early.
What does the owner-occupied share mean for me?
66.2% of occupied Palmdale homes are owner-occupied, so most ADU projects are for people improving the home they live in. If you plan to rent the ADU, check the city's current rules for rentals before you design the unit.
How should I think about budget compared with home value?
The median value of owner-occupied homes in Palmdale is $471,000 (2020 to 2024 Census estimates). Set your budget as a share of your home's value and think about how much the project adds to the home, not just what it costs.
How can I check a contractor's license?
The CSLB (Contractors State License Board) lets you look up any contractor's license status. Ask for the license number and check it before you sign anything.
What happens after I send my request?
Your request goes to one local builder who will review your lot details and project ideas, then reply with an estimate. You can ask questions before you decide.
Compare ADU activity across LA County
Where LA County is building ADUs
ADU units permitted in 2025, city by city. Select a city to open its guide.
- 0–21
- 22–28
- 29–56
- 57–99
- 100+
- No report
- Unincorporated
Most ADU permits in 2025
- 1Los Angeles7,446
- 2Long Beach644
- 3Glendale371
- 4Burbank241
- 5Pasadena222
- 6Lancaster209
- 7South Gate154
- 8Inglewood147
- 9Downey146
- 10Santa Monica143
Planning an ADU? A local builder can price yours.
Get my free estimatePermits: California HCD, Housing Element Annual Progress Report (APR), Table A2, data as of ; 2025 counts can still rise. Boundaries: Los Angeles County, City and Unincorporated Boundaries (Legal) (mainland only (islands omitted). simplified to about 300 m.)
Recent work by a contractor in our network
Photos from the contractor's own projects, used with permission. Captions name the type of work.

Bathroom in an ADU 
Addition / ADU interior 
Addition / ADU interior 
Addition / ADU bathroom
Request a free estimate from a local builder for your ADU
Tell us about the project. It takes about 30 seconds.
- You send a short request. Project type, ZIP code, timing and how to reach you.
- We match it. A local contractor for your project gets your request. Up to three may contact you, and we email you each one's name.
- You talk about your project. The estimate is free, with no obligation to hire.
Thanks — your request is in.
We're matching your project now. When a contractor takes it, we email you their name and phone number so you know who is calling.
We're matching your project now. A local contractor will call you at the number you gave us to talk about the next step.
Who gets your request
Your local match
Your project · works in Los Angeles County
Matched to your project. We check the project type and ZIP first. Up to three local contractors may contact you, and we email you each one's name.
Service areas
- Los Angeles
- Bel Air
- Brentwood
- Hollywood
- +36 more
Service areas as listed by the contractor ()