ADU builders in Pomona for older homes

ADUs in Pomona: what older homes mean for your project

65.6% of Pomona housing units were built before 1980, with a median year built of 1967 (Census 2020–2024).

Concept of a detached backyard ADU with white stucco, cedar siding and a small garden patio
Home inspiration · Concept image

What are you planning?

Project type

Free, no obligation. Up to three local contractors, never a long list.

Pomona at a glance

Share of housing units built before 1980 in Pomona
65.6%
Median year structure built in Pomona (all housing units)
1967
Share of occupied housing units in Pomona that are owner-occupied
54%

U.S. Census Bureau, American Community Survey 2020–2024 5-year estimates · data as of

  • Numbers from US Census public records
  • Up to three local contractors, never a long list
  • Free, no obligation

What do permits say an ADU costs?

From City of LA building permits, last 12 months. Not a contract price. How we calculate this

Declared values on City of Los Angeles building permits, last 12 months. The dataset covers the City of Los Angeles only, so treat it as a regional reference for Pomona. A declared value is what the permit states, not your contract price. How we calculate this.

Project type

$140,544median declared value, new ADU

Middle half of 2,004 permits Median

Every lot is different. A local contractor can price your project.

Source: LA Department of Building and Safety, Building Permits Issued 2020 to Present (data.lacity.org), permits on one- and two-family homes issued to ; fire rebuilds excluded. ZIP medians need 20+ permits.

Pomona housing facts from the U.S. Census

Pomona housing facts from the U.S. Census

Local numbers for Pomona, each with its source and date.

Median value of owner-occupied homes in Pomona1
$593,800
  1. 1 U.S. Census Bureau, American Community Survey 2020–2024 5-year estimates · data as of
ADU units permitted in Pomona, by yearEach bar is one year of building permits, as the city reported them to the state.
ADU units permitted in Pomona, by year
YearCount
201817
201971
202056
202192
2022No report
2023No report
2024No report
2025No report

* 2025 counts can still rise as late reports come in. Source: California HCD, Housing Element Annual Progress Report (APR), Table A2, data as of .

Planning your project

What Pomona's homes mean for your ADU

65.6% of Pomona housing units were built before 1980, and the median year built is 1967 (Census 2020–2024). If your home is one of these older homes, plan your ADU with the age of the existing house in mind from the start.

An older main house often has an electrical panel with limited spare capacity, and its water and sewer lines may be shared with a new unit. Ask the builder to check the panel size and the condition of these lines before design is final. These are things to check, not problems that every house has.

If you plan to convert an old garage, ask for lead-based paint testing for structures built before 1978. Old materials can also contain asbestos, so ask for an inspection before any demolition begins.

In Pomona, 54% of occupied housing units are owner-occupied (Census 2020–2024), so many projects are on homes people live in. The median value of owner-occupied homes is $593,800 (Census 2020–2024). Use that number to frame your budget in general terms: think about how much you want to put into the home compared with what it is worth.

The typical path for an ADU in Pomona

The typical path for an ADU in Pomona

  1. Check what your lot allows

    Start with the city of Pomona. Ask what your lot allows for an accessory dwelling unit, including setbacks, parking and size limits. Ask the builder to help you read the answer for your property.

  2. Design and plans

    Work with the builder on the layout, the floor plan and the drawings the city will need. For an older home, include a check of the electrical panel, the water and sewer connections, and any old garage walls you plan to change.

  3. Plan check and permit

    Submit your plans to the city for plan check. The city may ask for changes before it issues a permit. Ask the builder who will handle questions from the city during this review.

  4. Construction with inspections

    Once the permit is issued, construction begins. Expect inspections at key stages, such as framing, electrical, plumbing and final. For older houses, ask for lead testing before work on a pre-1978 structure and an asbestos check before any demolition.

  5. Final sign-off

    When the work is finished and the inspections are passed, the city gives final sign-off. Keep copies of all permits, inspection reports and the final approval for your records.

Questions about ADUs in Pomona

Does the age of Pomona homes affect an ADU project?

Yes, it can. The Census estimates that 65.6% of Pomona housing units were built before 1980, and the median year a structure was built is 1967 (Census 2020–2024). Older homes often have an electrical panel, water lines and sewer lines that were not sized for an extra unit. Ask the builder to check these before design starts. These are things to check, not problems that every house has.

I own a rental in Pomona. Is an ADU still worth planning?

The Census estimates that 54% of occupied housing units in Pomona are owner-occupied (Census 2020–2024). If you live in the home, plan the ADU around how you will use it. If you own a rental, think about how the unit will be managed, who will maintain it and what rules apply to tenants where you live.

How should I think about budget compared with home value in Pomona?

The median value of owner-occupied homes in Pomona is $593,800 (Census 2020–2024). Use that figure only as a general guide. Think about how much you want to put into your home compared with its value, and ask the builder to explain the cost of each part of the project before you decide.

Who sets the rules for an ADU on my lot?

Ask the city of Pomona what your lot allows and which permits you need before you sign a contract. Rules can change and depend on your property, so treat any answer you find online as a starting point, not a final answer.

How can I check a builder's license with the CSLB?

You can check any contractor's license status with the CSLB (Contractors State License Board). Ask the builder for its license number and check it yourself before you agree to any work.

Compare ADU activity across LA County

Where LA County is building ADUs

ADU units permitted in 2025, city by city. Select a city to open its guide.

Map of LA County cities shaded by ADU units permitted in 2025, with Pomona outlinedAgoura Hills: 17 ADU units permitted in 2025Alhambra: 102 ADU units permitted in 2025Arcadia: 98 ADU units permitted in 2025Artesia: 39 ADU units permitted in 2025Azusa: no HCD reportBaldwin Park: 119 ADU units permitted in 2025Bell: 25 ADU units permitted in 2025Bell Gardens: 26 ADU units permitted in 2025Bellflower: 18 ADU units permitted in 2025Beverly Hills: 31 ADU units permitted in 2025Bradbury: no HCD reportBurbank: 241 ADU units permitted in 2025Calabasas: 15 ADU units permitted in 2025Carson: 41 ADU units permitted in 2025Cerritos: 12 ADU units permitted in 2025Claremont: 23 ADU units permitted in 2025Commerce: no HCD reportCompton: no HCD reportCovina: 34 ADU units permitted in 2025Cudahy: 24 ADU units permitted in 2025Culver City: 83 ADU units permitted in 2025Diamond Bar: 50 ADU units permitted in 2025Downey: 146 ADU units permitted in 2025Duarte: 23 ADU units permitted in 2025El Monte: 107 ADU units permitted in 2025El Segundo: 25 ADU units permitted in 2025Gardena: 52 ADU units permitted in 2025Glendale: 371 ADU units permitted in 2025Glendora: 57 ADU units permitted in 2025Hawaiian Gardens: 11 ADU units permitted in 2025Hawthorne: 76 ADU units permitted in 2025Hermosa Beach: 11 ADU units permitted in 2025Hidden Hills: no HCD reportHuntington Park: 45 ADU units permitted in 2025Industry: no HCD reportInglewood: 147 ADU units permitted in 2025Irwindale: no HCD reportLa Canada Flintridge: 30 ADU units permitted in 2025La Habra Heights: no HCD reportLa Mirada: 23 ADU units permitted in 2025La Puente: 28 ADU units permitted in 2025La Verne: 22 ADU units permitted in 2025Lakewood: 99 ADU units permitted in 2025Lancaster: 209 ADU units permitted in 2025Lawndale: no HCD reportLomita: 7 ADU units permitted in 2025Long Beach: 644 ADU units permitted in 2025Los Angeles: 7,446 ADU units permitted in 2025Lynwood: no HCD reportMalibu: 5 ADU units permitted in 2025Manhattan Beach: 24 ADU units permitted in 2025Maywood: no HCD reportMonrovia: 58 ADU units permitted in 2025Montebello: 61 ADU units permitted in 2025Monterey Park: 78 ADU units permitted in 2025Norwalk: 119 ADU units permitted in 2025Palmdale: 68 ADU units permitted in 2025Palos Verdes Estates: 20 ADU units permitted in 2025Paramount: 57 ADU units permitted in 2025Pasadena: 222 ADU units permitted in 2025Pico Rivera: 96 ADU units permitted in 2025Pomona: no HCD reportRancho Palos Verdes: 16 ADU units permitted in 2025Redondo Beach: 25 ADU units permitted in 2025Rolling Hills: no HCD reportRolling Hills Estates: 5 ADU units permitted in 2025Rosemead: 136 ADU units permitted in 2025San Dimas: 30 ADU units permitted in 2025San Fernando: 40 ADU units permitted in 2025San Gabriel: 54 ADU units permitted in 2025San Marino: 14 ADU units permitted in 2025Santa Clarita: 29 ADU units permitted in 2025Santa Fe Springs: 15 ADU units permitted in 2025Santa Monica: 143 ADU units permitted in 2025Sierra Madre: 26 ADU units permitted in 2025Signal Hill: 8 ADU units permitted in 2025South El Monte: 22 ADU units permitted in 2025South Gate: 154 ADU units permitted in 2025South Pasadena: 26 ADU units permitted in 2025Temple City: 69 ADU units permitted in 2025Torrance: 89 ADU units permitted in 2025Vernon: no HCD reportWalnut: 36 ADU units permitted in 2025West Covina: no HCD reportWest Hollywood: 36 ADU units permitted in 2025Westlake Village: no HCD reportWhittier: 86 ADU units permitted in 2025
ADU units permitted, 2025
  • 0–21
  • 22–28
  • 29–56
  • 57–99
  • 100+
  • No report
  • Unincorporated

Most ADU permits in 2025

  1. 1Los Angeles7,446
  2. 2Long Beach644
  3. 3Glendale371
  4. 4Burbank241
  5. 5Pasadena222
  6. 6Lancaster209
  7. 7South Gate154
  8. 8Inglewood147
  9. 9Downey146
  10. 10Santa Monica143

Planning an ADU? A local builder can price yours.

Get my free estimate

Permits: California HCD, Housing Element Annual Progress Report (APR), Table A2, data as of ; 2025 counts can still rise. Boundaries: Los Angeles County, City and Unincorporated Boundaries (Legal) (mainland only (islands omitted). simplified to about 300 m.)

Request a free, no-obligation estimate from a local builder for your ADU

Tell us about the project. It takes about 30 seconds.

  1. You send a short request. Project type, ZIP code, timing and how to reach you.
  2. We match it. A local contractor for your project gets your request. Up to three may contact you, and we email you each one's name.
  3. You talk about your project. The estimate is free, with no obligation to hire.
What do you need?

* Add your email and we'll send you your contractor's name and phone number, so you know who's calling, plus updates as your project moves forward. We only use it for this request.

We match your request to a local contractor. Up to three in our network may contact you, and we email you each one's name. Read the consent above before sending.

Who gets your request

Your local match

Your project · works in Los Angeles County

Matched to your project. We check the project type and ZIP first. Up to three local contractors may contact you, and we email you each one's name.

  • Dark-tiled bathroom with a floating vanity and frameless glass
  • Living area in a new unit with a sofa and dining table
  • Living room of a new unit with neutral furniture

Service areas

  • Los Angeles
  • Bel Air
  • Brentwood
  • Hollywood
  • +36 more

Service areas as listed by the contractor ()

Get my free estimate