ADU Planning in West Covina

ADUs in West Covina's Older Homes

76.6% of West Covina housing units were built before 1980 (Census 2020–2024), so plan your electrical, water and sewer checks early.

Concept of a detached backyard ADU with white stucco, cedar siding and a small garden patio
Home inspiration · Concept image

What are you planning?

Project type

Free, no obligation. Up to three local contractors, never a long list.

West Covina at a glance

Housing units built before 1980 (2020–2024 estimates)
76.6%
Median year structure built, all housing units (2020–2024 estimates)
1967
Owner-occupied share of occupied housing units (2020–2024 estimates)
60.3%

U.S. Census Bureau, American Community Survey 2020–2024 5-year estimates · data as of

  • Numbers from US Census public records
  • Up to three local contractors, never a long list
  • Free, no obligation

What do permits say an ADU costs?

From City of LA building permits, last 12 months. Not a contract price. How we calculate this

Declared values on City of Los Angeles building permits, last 12 months. The dataset covers the City of Los Angeles only, so treat it as a regional reference for West Covina. A declared value is what the permit states, not your contract price. How we calculate this.

Project type

$140,544median declared value, new ADU

Middle half of 2,004 permits Median

Every lot is different. A local contractor can price your project.

Source: LA Department of Building and Safety, Building Permits Issued 2020 to Present (data.lacity.org), permits on one- and two-family homes issued to ; fire rebuilds excluded. ZIP medians need 20+ permits.

West Covina housing facts (U.S. Census)

West Covina housing facts (U.S. Census)

Local numbers for West Covina, each with its source and date.

Median value of owner-occupied homes (2020–2024 estimates)1
$779,800
  1. 1 U.S. Census Bureau, American Community Survey 2020–2024 5-year estimates · data as of
ADU units permitted in West Covina, by yearEach bar is one year of building permits, as the city reported them to the state.
ADU units permitted in West Covina, by year
YearCount
20196
202012
202156
2022128
202355
2024101
2025No report

* 2025 counts can still rise as late reports come in. Source: California HCD, Housing Element Annual Progress Report (APR), Table A2, data as of .

Planning your project

What West Covina's homes mean for your ADU

76.6% of West Covina housing units were built before 1980, and the median year built is 1967 (U.S. Census Bureau, 2020–2024). That makes older-home checks a central part of planning an ADU here. Start with the existing electrical panel, the water and sewer lines shared with the main house, and the age of the structure you plan to convert.

If you plan to convert an old garage, test for lead-based paint before work starts. Structures built before 1978 often need this check, and older materials can contain asbestos. These are things to check, not certainties for every house.

Most homeowners in West Covina live in the home they own: 60.3% of occupied housing units are owner-occupied. If you are improving the home you live in, plan the ADU around your own needs and budget. If you own a rental, check how the ADU will affect your tenants and your rental plans before you commit.

The median value of owner-occupied homes is $779,800. Use that figure only as a general frame: decide how much to put into the property relative to its value, and keep room in your budget for surprises in an older home. It is not a prediction of resale value.

The typical path for an ADU in West Covina

The typical path for an ADU in West Covina

  1. Check what your lot allows

    Confirm what your lot allows with the city before you spend on design. Ask about setbacks, parking and utility connections, and note the age of the main house.

  2. Design and plans

    Work with your builder on a layout that fits the lot. Ask for a plan that shows the existing electrical panel, water and sewer routes, and any garage walls you plan to convert.

  3. Plan check and permit

    Submit plans to the city for review. Expect questions about older structures, such as lead-based paint testing for pre-1978 buildings and the capacity of the existing electrical service.

  4. Construction with inspections

    Build the unit in stages that match the city's required inspections. Ask your builder to open walls where older wiring, plumbing or materials need a closer look.

  5. Final sign-off

    Once the work passes its final inspections, the city gives final sign-off. Keep all permits, inspection records and test results with your home papers.

Common questions about ADUs in West Covina

Why does the age of West Covina's homes matter for an ADU?

76.6% of West Covina housing units were built before 1980, and the median year built is 1967 (Census 2020–2024). Older homes may have electrical panels, water lines or sewer lines that need review before adding a unit. Ask your builder to check these early.

Should I test an old garage before converting it?

Yes, if the structure was built before 1978. Lead-based paint testing and an asbestos check are common steps to plan for. Your builder and the city can tell you what applies to your property.

Can I build an ADU if I rent out my West Covina home?

60.3% of occupied housing units in West Covina are owner-occupied (Census 2020–2024), so many owners live in their homes. If you rent out your home, review your lease, rental plans and local rules with the city before you start.

How does the $779,800 median home value affect my budget?

The median value of owner-occupied homes is $779,800 (Census 2020–2024). Use it only as a general frame for how much to invest relative to your home's value. It does not predict the cost or resale value of your ADU.

How do I check a contractor's license?

You can check any contractor's license status with the Contractors State License Board (CSLB). Ask your local builder for their license number and check it yourself.

What should I bring to a quote request?

Bring your property address, a short description of the space you want, photos of the garage or area, and any plans you have. The local builder who receives your request can use these details to scope your project.

Compare ADU activity across LA County

Where LA County is building ADUs

ADU units permitted in 2025, city by city. Select a city to open its guide.

Map of LA County cities shaded by ADU units permitted in 2025, with West Covina outlinedAgoura Hills: 17 ADU units permitted in 2025Alhambra: 102 ADU units permitted in 2025Arcadia: 98 ADU units permitted in 2025Artesia: 39 ADU units permitted in 2025Azusa: no HCD reportBaldwin Park: 119 ADU units permitted in 2025Bell: 25 ADU units permitted in 2025Bell Gardens: 26 ADU units permitted in 2025Bellflower: 18 ADU units permitted in 2025Beverly Hills: 31 ADU units permitted in 2025Bradbury: no HCD reportBurbank: 241 ADU units permitted in 2025Calabasas: 15 ADU units permitted in 2025Carson: 41 ADU units permitted in 2025Cerritos: 12 ADU units permitted in 2025Claremont: 23 ADU units permitted in 2025Commerce: no HCD reportCompton: no HCD reportCovina: 34 ADU units permitted in 2025Cudahy: 24 ADU units permitted in 2025Culver City: 83 ADU units permitted in 2025Diamond Bar: 50 ADU units permitted in 2025Downey: 146 ADU units permitted in 2025Duarte: 23 ADU units permitted in 2025El Monte: 107 ADU units permitted in 2025El Segundo: 25 ADU units permitted in 2025Gardena: 52 ADU units permitted in 2025Glendale: 371 ADU units permitted in 2025Glendora: 57 ADU units permitted in 2025Hawaiian Gardens: 11 ADU units permitted in 2025Hawthorne: 76 ADU units permitted in 2025Hermosa Beach: 11 ADU units permitted in 2025Hidden Hills: no HCD reportHuntington Park: 45 ADU units permitted in 2025Industry: no HCD reportInglewood: 147 ADU units permitted in 2025Irwindale: no HCD reportLa Canada Flintridge: 30 ADU units permitted in 2025La Habra Heights: no HCD reportLa Mirada: 23 ADU units permitted in 2025La Puente: 28 ADU units permitted in 2025La Verne: 22 ADU units permitted in 2025Lakewood: 99 ADU units permitted in 2025Lancaster: 209 ADU units permitted in 2025Lawndale: no HCD reportLomita: 7 ADU units permitted in 2025Long Beach: 644 ADU units permitted in 2025Los Angeles: 7,446 ADU units permitted in 2025Lynwood: no HCD reportMalibu: 5 ADU units permitted in 2025Manhattan Beach: 24 ADU units permitted in 2025Maywood: no HCD reportMonrovia: 58 ADU units permitted in 2025Montebello: 61 ADU units permitted in 2025Monterey Park: 78 ADU units permitted in 2025Norwalk: 119 ADU units permitted in 2025Palmdale: 68 ADU units permitted in 2025Palos Verdes Estates: 20 ADU units permitted in 2025Paramount: 57 ADU units permitted in 2025Pasadena: 222 ADU units permitted in 2025Pico Rivera: 96 ADU units permitted in 2025Pomona: no HCD reportRancho Palos Verdes: 16 ADU units permitted in 2025Redondo Beach: 25 ADU units permitted in 2025Rolling Hills: no HCD reportRolling Hills Estates: 5 ADU units permitted in 2025Rosemead: 136 ADU units permitted in 2025San Dimas: 30 ADU units permitted in 2025San Fernando: 40 ADU units permitted in 2025San Gabriel: 54 ADU units permitted in 2025San Marino: 14 ADU units permitted in 2025Santa Clarita: 29 ADU units permitted in 2025Santa Fe Springs: 15 ADU units permitted in 2025Santa Monica: 143 ADU units permitted in 2025Sierra Madre: 26 ADU units permitted in 2025Signal Hill: 8 ADU units permitted in 2025South El Monte: 22 ADU units permitted in 2025South Gate: 154 ADU units permitted in 2025South Pasadena: 26 ADU units permitted in 2025Temple City: 69 ADU units permitted in 2025Torrance: 89 ADU units permitted in 2025Vernon: no HCD reportWalnut: 36 ADU units permitted in 2025West Covina: no HCD reportWest Hollywood: 36 ADU units permitted in 2025Westlake Village: no HCD reportWhittier: 86 ADU units permitted in 2025
ADU units permitted, 2025
  • 0–21
  • 22–28
  • 29–56
  • 57–99
  • 100+
  • No report
  • Unincorporated

Most ADU permits in 2025

  1. 1Los Angeles7,446
  2. 2Long Beach644
  3. 3Glendale371
  4. 4Burbank241
  5. 5Pasadena222
  6. 6Lancaster209
  7. 7South Gate154
  8. 8Inglewood147
  9. 9Downey146
  10. 10Santa Monica143

Planning an ADU? A local builder can price yours.

Get my free estimate

Permits: California HCD, Housing Element Annual Progress Report (APR), Table A2, data as of ; 2025 counts can still rise. Boundaries: Los Angeles County, City and Unincorporated Boundaries (Legal) (mainland only (islands omitted). simplified to about 300 m.)

Request a free estimate from a local builder for your ADU

Tell us about the project. It takes about 30 seconds.

  1. You send a short request. Project type, ZIP code, timing and how to reach you.
  2. We match it. A local contractor for your project gets your request. Up to three may contact you, and we email you each one's name.
  3. You talk about your project. The estimate is free, with no obligation to hire.
What do you need?

* Add your email and we'll send you your contractor's name and phone number, so you know who's calling, plus updates as your project moves forward. We only use it for this request.

We match your request to a local contractor. Up to three in our network may contact you, and we email you each one's name. Read the consent above before sending.

Who gets your request

Your local match

Your project · works in Los Angeles County

Matched to your project. We check the project type and ZIP first. Up to three local contractors may contact you, and we email you each one's name.

  • Dark-tiled bathroom with a floating vanity and frameless glass
  • Living area in a new unit with a sofa and dining table
  • Living room of a new unit with neutral furniture

Service areas

  • Los Angeles
  • Bel Air
  • Brentwood
  • Hollywood
  • +36 more

Service areas as listed by the contractor ()

Get my free estimate