ADUs in Los Angeles: Permits, Costs and Steps

Building an ADU in the City of Los Angeles

LADBS issued 5,873 permits adding at least one ADU in the last 12 months; the median wait from permit submission to issue was 131 days.

Concept of a detached backyard ADU with white stucco, cedar siding and a small garden patio
Home inspiration · Concept image

What are you planning?

Project type

Free, no obligation. Up to three local contractors, never a long list.

Los Angeles at a glance

ADU permits issued in the City of Los Angeles, last 12 months
5,873 permits
Junior ADU (JADU) permits issued in the City of Los Angeles, last 12 months
742 permits
Median days from permit submission to issue for ADU permits, City of Los Angeles, last 12 months
131 days

LA Department of Building and Safety, Building Permits Issued 2020 to Present (data.lacity.org) · data as of

  • Numbers from LADBS public records
  • Up to three local contractors, never a long list
  • Free, no obligation

A useful first step

Before you start in Los Angeles

Check LADBS’s ADU resources and standard plans.

What to prepare

The city offers an approved standard-plan program. A standard design still needs a site-specific application, including a plot plan; ask which approvals apply to your lot.

LADBS ADU resources · Checked

What do permits say an ADU costs?

From City of LA building permits, last 12 months. Not a contract price. How we calculate this

Declared values on City of Los Angeles building permits, last 12 months. A declared value is what the permit states, not your contract price. How we calculate this.

Project type

$140,544median declared value, new ADU

Middle half of 2,004 permits Median

Every lot is different. A local contractor can price your project.

Source: LA Department of Building and Safety, Building Permits Issued 2020 to Present (data.lacity.org), permits on one- and two-family homes issued to ; fire rebuilds excluded. ZIP medians need 20+ permits.

City of Los Angeles permit figures (LADBS)

City of Los Angeles permit figures (LADBS)

Local numbers for Los Angeles, each with its source and date.

ADU units permitted in Los Angeles, by yearEach bar is one year of building permits, as the city reported them to the state.
ADU units permitted in Los Angeles, by year
YearCount
20187,039
20194,992
20203,668
20215,304
20227,550
20237,009
20247,330
20257,446

1st of 79 LA County cities for ADU permits in 2025

* 2025 counts can still rise as late reports come in. Source: California HCD, Housing Element Annual Progress Report (APR), Table A2, data as of .

What the permits declare for ADU work in Los Angeles

ProjectFigureRange on a shared scale
New ADU (median declared permit valuation, Bldg-New)Declared value on new ADU permits issued in the City of Los Angeles over the last 12 months. Not the full project cost.$140,544
ADU conversion (median declared permit valuation, Bldg-Alter/Repair)Declared value on ADU conversion permits issued in the City of Los Angeles over the last 12 months. Not the full project cost.$37,000

Bars share one scale, from $0 to $140,544.

Each figure is the median declared valuation on City of Los Angeles building permits over the last 12 months. It is the value written on the permit, not the contract price or full project cost, which is usually higher. Get an estimate from a local builder for your project.

Planning your project

LADBS issued 5,873 permits that add at least one ADU and 742 permits that add a junior ADU in the City of Los Angeles over the last 12 months. The median time from permit submission to issue for ADU permits was 131 days.

Many Los Angeles homeowners build an ADU to house family, add rental income or make space for a home office. The right choice depends on your lot, your home and your goals.

A junior ADU is smaller and is created inside or attached to an existing home. A full ADU is a separate unit with its own entrance. Ask a local builder to review your property before you choose.

The usual path to an ADU in Los Angeles

The usual path to an ADU in Los Angeles

  1. Check feasibility

    Check zoning, lot size and utility access for your property. Ask a local builder to review the options before you spend on design.

  2. Design and plans

    Prepare site and floor plans that show the new unit, parking and utility connections. Your builder can draft these or work with your architect.

  3. Plan check and permit

    Submit the plans to LADBS for plan check. Expect comments and revisions. Respond to each comment in full.

  4. Construction and inspections

    Once the permit is issued, the build starts. Expect inspections at key stages, such as foundation, framing and utilities.

  5. Final sign-off

    After the final inspection passes, LADBS signs off the project. Keep the final documents with your home records.

ADU questions for Los Angeles homeowners

Do I need a permit to build an ADU in Los Angeles?

Most ADU projects in the City of Los Angeles need a building permit from LADBS, the city's building department. Ask your local builder to confirm the permit path for your property before work starts.

How long do LADBS permits take for an ADU?

In the City of Los Angeles, the median ADU permit took 131 days from submission to issue over the last 12 months. Plan for a wait before construction can begin, and ask your builder how the timeline applies to your project.

What is the difference between a junior ADU and an ADU?

A junior ADU is smaller and is built within an existing home. A full ADU is a separate unit. In the City of Los Angeles, 742 permits added a junior ADU over the last 12 months, and 5,873 permits added at least one ADU. Your lot, home and budget decide which fits.

Can I convert a garage into an ADU?

Many homeowners ask about converting a garage. An ADU conversion is a different project from a new build. The median declared valuation for an ADU conversion permit in the City of Los Angeles was 37,000 USD over the last 12 months, though your builder can confirm what your garage needs.

What does an ADU cost in Los Angeles?

The median declared permit valuation for a new ADU in the City of Los Angeles was $140,544 over the last 12 months. That figure is the declared value on the permit, not the full project cost, which is usually higher. Request an estimate for your project.

How do I start an ADU project?

Send a request describing your lot, your goals and any plans you have. A local builder will review it and reply. You can check any contractor's license status with the CSLB (Contractors State License Board) before you sign anything.

Compare ADU activity across LA County

Where LA County is building ADUs

ADU units permitted in 2025, city by city. Select a city to open its guide.

Map of LA County cities shaded by ADU units permitted in 2025, with Los Angeles outlinedAgoura Hills: 17 ADU units permitted in 2025Alhambra: 102 ADU units permitted in 2025Arcadia: 98 ADU units permitted in 2025Artesia: 39 ADU units permitted in 2025Azusa: no HCD reportBaldwin Park: 119 ADU units permitted in 2025Bell: 25 ADU units permitted in 2025Bell Gardens: 26 ADU units permitted in 2025Bellflower: 18 ADU units permitted in 2025Beverly Hills: 31 ADU units permitted in 2025Bradbury: no HCD reportBurbank: 241 ADU units permitted in 2025Calabasas: 15 ADU units permitted in 2025Carson: 41 ADU units permitted in 2025Cerritos: 12 ADU units permitted in 2025Claremont: 23 ADU units permitted in 2025Commerce: no HCD reportCompton: no HCD reportCovina: 34 ADU units permitted in 2025Cudahy: 24 ADU units permitted in 2025Culver City: 83 ADU units permitted in 2025Diamond Bar: 50 ADU units permitted in 2025Downey: 146 ADU units permitted in 2025Duarte: 23 ADU units permitted in 2025El Monte: 107 ADU units permitted in 2025El Segundo: 25 ADU units permitted in 2025Gardena: 52 ADU units permitted in 2025Glendale: 371 ADU units permitted in 2025Glendora: 57 ADU units permitted in 2025Hawaiian Gardens: 11 ADU units permitted in 2025Hawthorne: 76 ADU units permitted in 2025Hermosa Beach: 11 ADU units permitted in 2025Hidden Hills: no HCD reportHuntington Park: 45 ADU units permitted in 2025Industry: no HCD reportInglewood: 147 ADU units permitted in 2025Irwindale: no HCD reportLa Canada Flintridge: 30 ADU units permitted in 2025La Habra Heights: no HCD reportLa Mirada: 23 ADU units permitted in 2025La Puente: 28 ADU units permitted in 2025La Verne: 22 ADU units permitted in 2025Lakewood: 99 ADU units permitted in 2025Lancaster: 209 ADU units permitted in 2025Lawndale: no HCD reportLomita: 7 ADU units permitted in 2025Long Beach: 644 ADU units permitted in 2025Los Angeles: 7,446 ADU units permitted in 2025Lynwood: no HCD reportMalibu: 5 ADU units permitted in 2025Manhattan Beach: 24 ADU units permitted in 2025Maywood: no HCD reportMonrovia: 58 ADU units permitted in 2025Montebello: 61 ADU units permitted in 2025Monterey Park: 78 ADU units permitted in 2025Norwalk: 119 ADU units permitted in 2025Palmdale: 68 ADU units permitted in 2025Palos Verdes Estates: 20 ADU units permitted in 2025Paramount: 57 ADU units permitted in 2025Pasadena: 222 ADU units permitted in 2025Pico Rivera: 96 ADU units permitted in 2025Pomona: no HCD reportRancho Palos Verdes: 16 ADU units permitted in 2025Redondo Beach: 25 ADU units permitted in 2025Rolling Hills: no HCD reportRolling Hills Estates: 5 ADU units permitted in 2025Rosemead: 136 ADU units permitted in 2025San Dimas: 30 ADU units permitted in 2025San Fernando: 40 ADU units permitted in 2025San Gabriel: 54 ADU units permitted in 2025San Marino: 14 ADU units permitted in 2025Santa Clarita: 29 ADU units permitted in 2025Santa Fe Springs: 15 ADU units permitted in 2025Santa Monica: 143 ADU units permitted in 2025Sierra Madre: 26 ADU units permitted in 2025Signal Hill: 8 ADU units permitted in 2025South El Monte: 22 ADU units permitted in 2025South Gate: 154 ADU units permitted in 2025South Pasadena: 26 ADU units permitted in 2025Temple City: 69 ADU units permitted in 2025Torrance: 89 ADU units permitted in 2025Vernon: no HCD reportWalnut: 36 ADU units permitted in 2025West Covina: no HCD reportWest Hollywood: 36 ADU units permitted in 2025Westlake Village: no HCD reportWhittier: 86 ADU units permitted in 2025
ADU units permitted, 2025
  • 0–21
  • 22–28
  • 29–56
  • 57–99
  • 100+
  • No report
  • Unincorporated

Most ADU permits in 2025

  1. 1Los Angeles7,446
  2. 2Long Beach644
  3. 3Glendale371
  4. 4Burbank241
  5. 5Pasadena222
  6. 6Lancaster209
  7. 7South Gate154
  8. 8Inglewood147
  9. 9Downey146
  10. 10Santa Monica143

Planning an ADU? A local builder can price yours.

Get my free estimate

Permits: California HCD, Housing Element Annual Progress Report (APR), Table A2, data as of ; 2025 counts can still rise. Boundaries: Los Angeles County, City and Unincorporated Boundaries (Legal) (mainland only (islands omitted). simplified to about 300 m.)

Request a free estimate from a local builder

Tell us about the project. It takes about 30 seconds.

  1. You send a short request. Project type, ZIP code, timing and how to reach you.
  2. We match it. A local contractor for your project gets your request. Up to three may contact you, and we email you each one's name.
  3. You talk about your project. The estimate is free, with no obligation to hire.
What do you need?

* Add your email and we'll send you your contractor's name and phone number, so you know who's calling, plus updates as your project moves forward. We only use it for this request.

We match your request to a local contractor. Up to three in our network may contact you, and we email you each one's name. Read the consent above before sending.

Who gets your request

Your local match

Your project · works in Los Angeles County

Matched to your project. We check the project type and ZIP first. Up to three local contractors may contact you, and we email you each one's name.

  • Dark-tiled bathroom with a floating vanity and frameless glass
  • Living area in a new unit with a sofa and dining table
  • Living room of a new unit with neutral furniture

Works in Los Angeles

  • Los Angeles
  • Bel Air
  • Brentwood
  • Hollywood
  • +36 more

Service areas as listed by the contractor ()

Get my free estimate