Building an ADU in Santa Monica: planning with local data
ADUs in Santa Monica: what local data means for your project
Santa Monica issued 143 ADU building permits in 2025 as reported so far, and 73.4% of housing units were built before 1980 (2020–2024).

Santa Monica at a glance
- ADU units with building permits issued in 2025 as reported so far, Santa Monica
- 143
- ADU units completed in 2025 as reported so far, Santa Monica
- 6
- Rank by ADU units permitted in 2025 among Los Angeles County cities that filed, Santa Monica
- 10 of 79
California HCD, Housing Element Annual Progress Report (APR), Table A2 · data as of
- Numbers from HCD and US Census public records
- Up to three local contractors, never a long list
- Free, no obligation
What do permits say an ADU costs?
From City of LA building permits, last 12 months. Not a contract price. How we calculate this
Declared values on City of Los Angeles building permits, last 12 months. The dataset covers the City of Los Angeles only, so treat it as a regional reference for Santa Monica. A declared value is what the permit states, not your contract price. How we calculate this.
Source: LA Department of Building and Safety, Building Permits Issued 2020 to Present (data.lacity.org), permits on one- and two-family homes issued to ; fire rebuilds excluded. ZIP medians need 20+ permits.
Santa Monica housing and ADU permit facts
Santa Monica housing and ADU permit facts
Local numbers for Santa Monica, each with its source and date.
- Change in ADU units permitted, 2022 to 2025, Santa Monica1
- 3.6%
- Share of Santa Monica housing units built before 1980, 2020 to 20242
- 73.4%
- Median year structure built, all Santa Monica housing units, 2020 to 20242
- 1968
- Share of occupied Santa Monica housing units that are owner-occupied, 2020 to 20242
- 27.9%
- Median value of owner-occupied Santa Monica homes, 2020 to 20242
- $1,755,500
| Year | Count |
|---|---|
| 2018 | 20 |
| 2019 | 60 |
| 2020 | 40 |
| 2021 | 82 |
| 2022 | 138 |
| 2023 | 127 |
| 2024 | 130 |
| 2025 | 143 |
10th of 79 LA County cities for ADU permits in 2025
* 2025 counts can still rise as late reports come in. Source: California HCD, Housing Element Annual Progress Report (APR), Table A2, data as of .
Planning your project
What Santa Monica's homes mean for your ADU
Most homes in Santa Monica are older: 73.4% of housing units were built before 1980, and the median year built is 1968 (Census 2020–2024). That age shapes what an ADU needs. Plan for the existing house as well as the new unit.
Check the electrical panel first. An older main house may not have spare capacity for a new kitchen, bath and heating load. Water and sewer lines may also be shared with the main house, so ask how the new unit will connect and whether those lines need work. If you plan to convert an old garage, test for lead-based paint in structures built before 1978 and ask about possible asbestos in older materials. These are things to check, not certainties for every house.
Owners who rent out a property should plan for tenants too. Only 27.9% of occupied homes are owner-occupied, so renting is common here. Schedule noisy work around tenants and keep them informed about dates. The median value of owner-occupied homes is $1,755,500 (Census 2020–2024). Use that as context for how much to put into a home relative to its value, not as a resale forecast.
Permit activity is active, but the counts can change. 143 ADU units had permits issued in 2025 as reported so far, and 6 units were completed in 2025 as reported so far.
The typical path for an ADU in Santa Monica
The typical path for an ADU in Santa Monica
Check what your lot allows
Ask the city what your lot allows for an ADU, including setbacks, height and parking. Confirm the rules for your address before you spend money on design.
Design and plans
Your builder drafts the plans. For an older house, the plans should show the electrical panel, the water and sewer connections, and any garage conversion work in detail.
Plan check and permit
Submit the plans to the city for plan check and permit. Expect comments and corrections. Ask your builder to answer them in writing.
Construction with inspections
Build the unit with inspections at the stages the city requires. Before a garage conversion starts, have lead-based paint testing done for structures built before 1978 and ask about possible asbestos in older materials.
Final sign-off
Once the final inspections pass, the city signs off on the project. Keep the sign-off papers with your home records.
Questions about ADUs in Santa Monica
How many ADU permits does Santa Monica issue?
The state HCD report shows 143 ADU units with building permits issued in 2025, as reported so far. That count can still rise as late reports arrive. Among the 79 Los Angeles County cities that filed, Santa Monica ranks 10 of 79 for that year. Only 6 ADU units were completed in 2025, as reported so far.
Does building an ADU on an older Santa Monica lot add extra checks?
It can. 73.4% of Santa Monica housing units were built before 1980, and the median year built is 1968 (Census 2020–2024). Older houses may have a small electrical panel, shared water and sewer lines, and older materials. Have the builder check these before design starts.
What if I rent out my home in Santa Monica?
Only 27.9% of occupied Santa Monica homes are owner-occupied (Census 2020–2024), so renting is common here. If you plan to rent the ADU or the main house, talk through the schedule with your builder and keep your tenants informed about work dates. Check the local rules for your situation with the city.
How should I think about budget against home value?
The median value of owner-occupied Santa Monica homes is $1,755,500 (Census 2020–2024). Use that as context for how much to put into your home relative to its value. It is not a resale forecast. Ask your builder for a written estimate that lists the work in full.
How can I check a contractor before I hire one?
Check any contractor's license status with the CSLB (Contractors State License Board) before you sign anything. Ask the builder who receives your request to explain the scope, the schedule and how the work will be inspected.
Compare ADU activity across LA County
Where LA County is building ADUs
ADU units permitted in 2025, city by city. Select a city to open its guide.
- 0–21
- 22–28
- 29–56
- 57–99
- 100+
- No report
- Unincorporated
Most ADU permits in 2025
- 1Los Angeles7,446
- 2Long Beach644
- 3Glendale371
- 4Burbank241
- 5Pasadena222
- 6Lancaster209
- 7South Gate154
- 8Inglewood147
- 9Downey146
- 10Santa Monica143
Planning an ADU? A local builder can price yours.
Get my free estimatePermits: California HCD, Housing Element Annual Progress Report (APR), Table A2, data as of ; 2025 counts can still rise. Boundaries: Los Angeles County, City and Unincorporated Boundaries (Legal) (mainland only (islands omitted). simplified to about 300 m.)
Recent work by a contractor in our network
Photos from the contractor's own projects, used with permission. Captions name the type of work.

Bathroom in an ADU 
Addition / ADU interior 
Addition / ADU interior 
Addition / ADU bathroom
Request a free estimate from a local builder for your ADU
Tell us about the project. It takes about 30 seconds.
- You send a short request. Project type, ZIP code, timing and how to reach you.
- We match it. A local contractor for your project gets your request. Up to three may contact you, and we email you each one's name.
- You talk about your project. The estimate is free, with no obligation to hire.
Thanks — your request is in.
We're matching your project now. When a contractor takes it, we email you their name and phone number so you know who is calling.
We're matching your project now. A local contractor will call you at the number you gave us to talk about the next step.
Who gets your request
Your local match
Your project · works in Los Angeles County
Matched to your project. We check the project type and ZIP first. Up to three local contractors may contact you, and we email you each one's name.
Works in Santa Monica
- Santa Monica
- Los Angeles
- Bel Air
- Brentwood
- +36 more
Service areas as listed by the contractor ()